my 300k 2
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

my 300k 2



thank you all. it means a lot to know you all think it looks good. teh stripe 
was hand painted on, and all the chrome is back on. as for the engine, the 
machine shop said maybe friday, meaning i put the heads on ( they are doing the 
short block assembly ) and put it in, after doing up the engine compartment.
thank you for the painting info. i am not sure if i am going to paint the 
heads or not. 
oh, from teh start, they had to weld in new metal ( no fiberglass at all ) 
around both rear wells. patches i think there were three or four, and one up 
front if i remember right. 
well, again thanks, it means a lot.
tim


[Non-text portions of this message have been removed]





Home Back to the Home of the Forward Look Network Archive Sitemap


Copyright © The Forward Look Network. All rights reserved.

Opinions expressed in posts reflect the views of their respective authors.
This site contains affiliate links for which we may be compensated.